Control systems · from design to handover

    Design and modernization of industrial machine controls

    From controls for a new machine to upgrading an existing system. The goal is a reliable, documented control system that remains clear and serviceable in the future.

    Recognize the situation

    When is it worth considering a new control system?

    Do you have a good machine, but its controls are causing increasing uncertainty?

    • 01Replacement parts for the old controls are becoming difficult to source.
    • 02Electrical faults and unplanned stops are becoming frequent.
    • 03The machine needs an additional function.
    • 04The existing controls are unclear or undocumented.
    • 05The machine still works, but its controls are obsolete.
    • 06An older machine needs to be returned to production.

    Complete project lifecycle

    What we deliver

    We do not force an off-the-shelf solution onto the machine. We design the controls around its operation, the industrial environment and the operator's requirements.

    01

    Design and implementation

    Controls tailored to the machine's operation and its industrial environment.

    02

    Commissioning and testing

    Instrument-based checks and commissioning support for dependable operation.

    03

    Documentation and support

    Clear documentation so the system can be serviced and developed later.

    Why BorvEx?

    From assessment to commissioning, guided by one consistent engineering approach.

    A control system remains manageable over the long term when design, assembly, testing and documentation follow the same engineering logic.

    More than 16 years of professional experience

    Hand assembly and instrument-based testing

    Hungarian engineering with a local technical contact

    Documented solutions that remain clear later

    CE conformity assessment is available through an independent, accredited partner. Read the details in our service conditions.

    How it is built

    A traceable process and a clear handover.

    From assessment through commissioning, every step builds on the engineering decisions made before it.

    1. 01

      Initial discussion and assessment

      We begin with the machine's purpose, the current situation and the required operation.

    2. 02

      Design and component selection

      We adapt the technical solution to the industrial environment and operator requirements.

    3. 03

      Assembly and testing

      Hand assembly is followed by inspection and instrument-based testing.

    4. 04

      Handover and commissioning support

      A documented handover makes future operation and servicing easier to follow.

    Next step

    Does a machine need new or modernized controls?

    You do not need a finished technical specification. Describe what the machine needs to do, and we will discuss the options with you.

    I want to discuss a project

    Tell us about your project or the fault, and we will send you a personalized solution proposal.

    I want to discuss a project

    Precise Requirements Review
    Technical Consultation
    Fast Feedback